亚洲欧美久久久精品|久久国产天堂福利天堂|美女视频黄全部免费视频|视频二区丝袜国产欧美日韩|欧美日韩国产精品自在自线|亚洲爆乳熟妇息与子久久久|亚洲国产一区二区久久久精品|国产精品成人一区二区三区影院

EPC Products Civil Engineering Testing Instruments Geotechnical Testing Pile Testing Piles Quality Control Pile Capacity High Strain Testing Top Force Transducer
產(chǎn)品中心
BBS|Hot Topic
Top Force Transducer

Model:TOP TRANSDUCER

Use:Top force transducer method eliminates concrete build up or excavation on drilled concrete piles.

Standard:



Top Force Transducers for use with the Pile Dynamics Analyzer-Dynamic Load Tester (PDA-DLT) and the Pile Driving Analyzer (PDA), available in three sizes:

  • 91 cm (36″) – 4,000 tons (includes 8 strains)
  • 61 cm (24″) – 2,400 tons (includes 8 strains)
  • 41 cm (16″) – 1,150 tons (includes 8 strains)


Top force transducer method eliminates concrete build up or excavation on drilled concrete piles. Using Pile Dynamics, Inc’s Top Force Transducer allows for quick set up. When used with the Pile Dynamics Analyzer – Dynamic Load Tester (PDA-DLT), the Top Force Transducer improves force accuracy and reduces labor costs. Force measurements may be taken via bolted on gages, load cell, dolly, or from ram measurements.

Advantages Include:
? No “windows” in casting provide more accurate force
? Area and modulus are identifiable
? Less pile preparation required
? Eliminates excavations
? Accelerometers mounted near top of pile, no longer requiring two diameter distance
? Eliminates errors due to bending


Project Case
Solution
Download
相關(guān)標(biāo)簽
PDI,Pile Dynamics